{"id":326,"date":"2015-01-26T13:35:00","date_gmt":"2015-01-26T13:35:00","guid":{"rendered":"http:\/\/www.cwsdev.co.uk\/ladyteal\/?p=326"},"modified":"2015-01-26T13:35:00","modified_gmt":"2015-01-26T13:35:00","slug":"horse-drawn-boat","status":"publish","type":"post","link":"https:\/\/www.ladyteal.co.uk\/horse-drawn-boat\/","title":{"rendered":"Horse Drawn Boat"},"content":{"rendered":"
We have recently passed the horse drawn boat Elland as it makes it\u2019s way along the Leeds and Liverpool, probably the first horse drawn boat along the length for over 60 years. More about Elland.<\/a>\u00a0It is lovely to see the guys in traditional garb and most amazingly they legged it through the Foulridge tunnel. Unladen L&L short boats used to take about and hour to go through, so they did really well to leg a narrow through in 38 minutes, well done guys!<\/p>\n