{"id":358,"date":"2015-01-26T13:40:26","date_gmt":"2015-01-26T13:40:26","guid":{"rendered":"http:\/\/www.cwsdev.co.uk\/ladyteal\/?p=358"},"modified":"2015-02-10T10:55:15","modified_gmt":"2015-02-10T10:55:15","slug":"boat-painting","status":"publish","type":"post","link":"https:\/\/www.ladyteal.co.uk\/boat-painting\/","title":{"rendered":"Boat Painting"},"content":{"rendered":"
Earlier than we expected we are having to have the boat painted. We anticipated the paintwork to have survived longer than it has but it is all dependent on prep and finish.<\/p>\n
She is in now being stripped back for a load of undercoats, top coats and new signwriting. We are keeping the colour scheme and sign work the same so no big change just a lot shinier!<\/p>\n
Will post some photos once she is done.<\/p>\n","protected":false},"excerpt":{"rendered":"
Earlier than we expected we are having to have the boat painted. We anticipated the paintwork to have survived longer than it has but it is all dependent on prep and finish. She is in now being stripped back for a load of undercoats, top coats and new signwriting. We are keeping the colour scheme […]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"footnotes":"","_jetpack_memberships_contains_paid_content":false,"jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[1],"tags":[],"jetpack_publicize_connections":[],"acf":[],"yoast_head":"\n